Funds raised US$460,514,903
Nets funded 222,721,093
People protected 400,897,967

Kinshasa Province, 2023, Congo (Dem. Rep.)  

Summary

Nets: 4,364,050 LLINs
When: Sep 23
Distributed by:  NMCP/Various


4.4 million nets will be distributed in all 17 Health Zones to achieve universal coverage (all sleeping spaces covered) across a population of some 7.9 million people.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 0 donations from 0 donors in 0 countries
  • Smallest donation: 1.00, largest donation: 0
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
369,350   Binza Meteo ZdS, Kinshasa Province Sep 23 Status
373,900   Binza Ozone ZdS, Kinshasa Province Sep 23 Status
235,150   Biyela ZdS, Kinshasa Province Sep 23 Status
68,750   Gombe ZdS, Kinshasa Province Sep 23 Status
258,000   Kikimi ZdS, Kinshasa Province Sep 23 Status
248,000   Kimbanseke ZdS, Kinshasa Province Sep 23 Status
215,800   Kingabwa ZdS, Kinshasa Province Sep 23 Status
191,900   Kingasani ZdS, Kinshasa Province Sep 23 Status
351,300   Kisenso ZdS, Kinshasa Province Sep 23 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
273,350   Lemba ZdS, Kinshasa Province Sep 23 Status
259,350   Makala ZdS, Kinshasa Province Sep 23 Status
185,850   Maluku 1 ZdS, Kinshasa Province Sep 23 Status
323,650   Masina 1 ZdS, Kinshasa Province Sep 23 Status
227,500   Mont Ngafula I ZdS, Kinshasa Pro… Sep 23 Status
173,250   Mont Ngafula Ii ZdS, Kinshasa Pr… Sep 23 Status
284,350   Nsele ZdS, Kinshasa Province Sep 23 Status
324,600   Selembao ZdS, Kinshasa Province Sep 23 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed