We collect cookies. Read our cookies policy. Do you accept?

Our Story

placeholder

Redefining Possible

Today, our team of more than 1000 passionate engineers, experts, and leaders, are all focused on bringing our pioneering vision to life. We’re developing a world-class manufacturing facility in Marina, CA and have offices and workshops in Santa Cruz, San Carlos, Washington, D.C., and Munich, Germany.

But it hasn’t always been like that.

2009

The Beginning

Day and night, a small team of seven engineers worked out of “The Barn,” our workshop in the mountains above Santa Cruz. We explored the frontiers of technologies like electric motors, flight software, and lithium-ion batteries — engineering almost every component from the ground up.

2012

NASA Partnership

Beginning in 2012, Joby was selected to collaborate with NASA on several groundbreaking electric flight projects, including the X-57 and LEAPTech.

2015

Subscale Demonstrator

After many years of subscale testing and analysis, we arrived at our current configuration and flew this subscale technology demonstrator for the first time.

2017

Full-Scale Demonstrator

Our first full-scale demonstrator took to the skies in 2017.

2019

Pre-Production Prototype

In 2019, our pre-production prototype began a rigorous flight testing program.

2019

Working Alongside Toyota

As well as becoming a strategic investor in Joby, Toyota has deployed dozens of engineers to work shoulder-to-shoulder with our team, lending their expertise on factory layout, manufacturing process development and high-volume production.

2020

Achieving U.S. Air Force Approval

Joby became the first eVTOL company to receive airworthiness approval from the U.S Air Force in December 2020. Flying our aircraft on-base and having access to government testing facilities provides an opportunity to develop our operational capabilities in advance of commercial launch.

2020

An Expanded Partnership with Uber

We deepened our partnership with Uber, agreeing to integrate our aerial ridesharing service into the Uber app, and vice versa, across all U.S. launch markets. Uber increased their investment in Joby and we acquired the Elevate division, bringing their software tools and commercial launch expertise in house.

2020

Progress Towards Certification

In 2020, we signed our Stage 4 “G-1” certification basis with the FAA, having received an initial Stage 2 G-1 from the agency in 2019. This document lays out a clear path to certifying our aircraft for commercial flights.

2021

Flying High

During the year that Joby listed on the New York Stock Exchange (NYSE:JOBY), our pre-production prototype flew more than 5,300 miles, including a flight of 154.6 miles on a single charge.

We also built a second pre-production prototype, completed our first FAA production conformity inspection and officially began our journey to become the first certified eVTOL airline.

2022

Part 135

We received our Part 135 Air Carrier Certificate, which allows Joby to operate a commercial air taxi service.

2022+

Looking Ahead

​​In the years ahead, we’ll be focusing on three key goals: certifying our aircraft, scaling our manufacturing, and preparing for operations.