Mongala Province, 2022, Congo (Dem. Rep.)  

Summary

Nets: 1,915,850 LLINs
When: Nov-Dec 22
Distributed by:  PNLP/TBD


1.9 million nets will be distributed in all Health Zones in 12 regions to achieve universal coverage (all sleeping spaces covered) across a population of some 3.5 million people.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 6,069 donations from 5,099 donors in 74 countries
  • Smallest donation: AUD1.00, largest donation: US$250,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
221,850   Binga ZdS, Mongala Province Nov-Dec 22 Status
103,400   Bongandanga ZdS, Mongala Province Nov-Dec 22 Status
114,050   Bosomanzi ZdS, Mongala Province Nov-Dec 22 Status
108,350   Bosomondanda ZdS, Mongala Province Nov-Dec 22 Status
160,900   Bosondjo ZdS, Mongala Province Nov-Dec 22 Status
172,350   Bumba ZdS, Mongala Province Nov-Dec 22 Status
261,650   Lisala ZdS, Mongala Province Nov-Dec 22 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
93,250   Lolo ZdS, Mongala Province Nov-Dec 22 Status
213,950   Pimu ZdS, Mongala Province Nov-Dec 22 Status
114,700   Yamaluka ZdS, Mongala Province Nov-Dec 22 Status
238,450   Yambuku ZdS, Mongala Province Nov-Dec 22 Status
112,950   Yamongili ZdS, Mongala Province Nov-Dec 22 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete