About this project
Construction of windfarm east of Aberystwyth within Powys Council local authority boundary. Up to 27 turbines with up to 81-89.1 MW generating capacity. Additional works: substation and control building, monitoing mast, electrical cables, new access tracks and widening existing tracks.Recent activity
A letter from the Applicant – Mynydd y Gwynt Limited – notifying the Inspectorate of their decision to withdraw the Mynyyd y Gwynt Wind Farm application has been published.
22 May 2014
Deadline to accept or not accept the application
22 May 2014
Application received by the Planning Inspectorate
24 April 2014
The developer confirmed to the IPC that the scheme has been revised from the one initially advised for this website. The scheme has been altered from 23 turbines with up to 69 MW generating capacity to 27 turbines with up to 81MW generating capacity. Additional works: substation and control building, monitoing mast, electrical cables, new access tracks and widening existing tracks.
22 June 2011
What happens next
This project has been withdrawn by the developer.