White Rose Carbon Capture and Storage Project

About this project

A 426 MWe coal fired power station with carbon capture equipment.
The main components of the development will include an Oxy Fuel pulverized coal boiler, turbine-generator unit, air separation unit, flue gas desulphurization plant, gas condenser plant and carbon dioxide capture system together with associated development.

Visit developer’s website

What happens next

The application is expected to be submitted to the Planning Inspectorate Q4 2014.

After receipt of the application, there will be 28 days to review the application and decide whether or not to accept it.

If the application is accepted, we will advise the timescales when interested parties can register to make a representation.

If the application is accepted, we will:

  • Publish all the application documents on this project page
  • Publish the date from which you will be able to register to put your case on the application
  • Publish the date on which registration will close.