Improvement of a 1 mile (1.5km) stretch of the A63 at Castle Street by lowering the level of the road into a cutting by approximately 7.6 yards (7 metres) at Mytongate Junction. Ferensway and Commercial Road would pass over, being raised by approximately 1.09 yards (1 metre), creating a split level junction. The project will also widen the eastbound carriageway to three lanes between Mytongate and Market Place, with the nearside lane being marked for local traffic. The westbound carriageway would have two lanes, as at present. Provide pedestrian footbridges at Porter Street, in front of Princes Quay shopping centre and at Market Place, to allow pedestrians to cross above Castle Street. Close accesses from Castle Street to the Holiday Inn Hotel, Spruce Road and Waverley Street, on safety grounds. Alternative accesses would be provided.



What happens next

The application is expected to be submitted to the Planning Inspectorate October 2014.

After receipt of the application, there will be 28 days to review the application and decide whether or not to accept it.

If the application is accepted, we will advise the timescales when interested parties can register to make a representation.

If the application is accepted, we will:

  • Publish all the application documents on this project page
  • Publish the date from which you will be able to register to put your case on the application
  • Publish the date on which registration will close.