Proposed 400kV electricity transmission connections from NuGen’s proposed new nuclear generating station to be known as Moorside (near Sellafield) in West Cumbria to the existing transmission system in Cumbria/Lancashire

Visit developer’s website

What happens next

The application is expected to be submitted to the Planning Inspectorate 2017.

After receipt of the application, there will be 28 days to review the application and decide whether or not to accept it.

If the application is accepted, we will advise the timescales when interested parties can register to make a representation.

If the application is accepted, we will:

  • Publish all the application documents on this project page
  • Publish the date from which you will be able to register to put your case on the application