About this project
The proposed NDR would be a dual-carriageway distributor road which would link the A1067 Fakenham Road at Attlebridge in the west, to the A47 at Postwick in the east over a length of 20.1km. The alignment includes 8 at-grade roundabout junctions, 2 grade-separated junctions and 7 bridge crossings."Recent activity
Following the Preliminary Meeting, the Secretary of State is now considering whether this application should now be handled by a panel of examining inspectors. Therefore it is not yet possible to publish a Rule 8 letter, which would include the timetable for the examination. To minimise disruption, this notice of procedural decisions requests written representations and other material from interested parties. The Rule 8 letter, including the timetable, will be published by the end of June 2014.
- Preliminary Meeting takes place
- Examination begins
Drop in event in Norwich
Join Planning Inspectorate staff in Norwich on 24 February to find out about the application process. See the poster for locations and times.
What happens next
Notice of the procedural decision has been issued by the Examining authority to interested parties in the Rule 8 letter; this includes information about how the examination will be conducted and the timetable as currently set out.
Dates of the examination can also be viewed on the Examination Timetable page.
If you have a legal interest in land affected by a nationally significant infrastructure project and have not already registered to become an interested party, then you can make a request to the Examining Authority to become an interested party under s102A of the Planning Act 2008 (as amended).