You can filter the results to show only the items that match your interest.
Documents Published By Stage
Source | Description |
---|---|
Applicant | Navitus Bay Development Limited Certificates of Compliance; with s56 and s59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 |
Other | |
Local Authorities | Hart District Council Adequacy of Consultation response from Hart District Council |
Other | |
Other | |
Other | 7.1 Cable Statement Cable Statement |
Other | 7.2 Safety Zone Statement Safety Zone Statement |
Local Authorities | Poole Borough Council Adequacy of Consultation response from Poole Borough Council |
Local Authorities | Bracknell Forest Borough Council Adequacy of Consultation response from Bracknell Forest Borough Council |
Local Authorities | Bournemouth Borough Council Adequacy of Consultation response from Bournemouth Borough Council |
Local Authorities | Weymouth & Portland Borough Council and West Dorset District Council (joint) Adequacy of Consultation response from Weymouth & Portland Borough Council and West Dorset District Council |
Local Authorities | Hampshire County Council Adequacy of Consultation response from Hampshire County Council |
Applicant | Dorset County Council Adequacy of Consultation response from Dorset County Council |
Local Authorities | Portsmouth City Council Adequacy of Consultation response from Portsmouth City Council |
Local Authorities | New Forest District Council Adequacy of Consultation response from New Forest District Council |
Local Authorities | Purbeck District Council Adequacy of Consultation response from Purbeck District Council |
Local Authorities | Christchurch Borough Council Adequacy of Consultation response from Christchurch Borough Council |
Local Authorities | New Forest National Park Authority Adequacy of Consultation response from New Forest National Park Authority |
Local Authorities | Test Valley Borough Council Adequacy of Consultation response from Test Valley Borough Council |
Local Authorities | East Dorset District Council Adequacy of Consultation response from East Dorset District Council |
Other | 1.1 Covering Letter to the Planning Inspectorate Covering Letter to the Planning Inspectorate |
Other | 1.3 Application Form Application Form |
Other | 1.4 Copies of Newspaper Notices Copies of Newspaper Notices |
Other | 1.2 Navigation Document Navigation Document |
Other | 4.1 Statement of Reasons Statement of Reasons |
Other | 4.2 Funding Statement Funding Statement |
Other | 4.3 Book of Reference Part 1 of 5 Book of Reference Part 1 of 5 |
Other | 4.3 Book of Reference Part 2 of 5 Book of Reference Part 2 of 5 |
Other | 4.3 Book of Reference Part 3 of 5 Book of Reference Part 3 of 5 |
Other | 4.3 Book of Reference Part 4 of 5 Book of Reference Part 4 of 5 |
Other | 4.3 Book of Reference Part 5 of 5 Book of Reference Part 5 of 5 |
Other | 4.3 Book of Reference Schedules 1 and 2 Book of Reference Schedules 1 and 2 |
Other | 4.4 Section 132 Statement Section 132 Statement |
Other | 3.1 Draft Development Consent Order Draft Development Consent Order |
Other | 3.2 Explanatory Memorandum Explanatory Memorandum |
Other | 6.1.1.1 Volume A Introduction Chapter 1 Introduction Introduction Chapter |
Other | 6.1.1.2 Volume A Introduction Chapter 2 Project Description Overview Project Description Overview Chapter |
Other | 6.1.1.3 Volume A Introduction Chapter 3 Legislation and Policy Legislation and Policy Chapter |
Other | 6.1.1.4 Volume A Introduction Chapter 4 Consultations Consultations Chapter |
Other | 6.1.1.5 Volume A Introduction Chapter 5 EIA Methodology Environmental Impact Assessment Methodology Chapter |
Other | 6.1.2.1 Volume B Offshore Chapter 1 Offshore Introduction Offshore Introduction Chapter |
Other | 6.1.2.2 Volume B Offshore Chapter 2 Offshore Project Description Offshore Project Description Chapter |
Other | 6.1.2.3 Volume B Offshore Chapter 3 Offshore Legislation and Policy Offshore Legislation and Policy Chapter |
Other | 6.1.2.4 Volume B Offshore Chapter 4 Offshore Alternatives Offshore Alternatives Chapter |
Other | 6.1.2.5 Volume B Offshore Chapter 5 Physical Processes Physical Processes Chapter |
Other | 6.1.2.6 Volume B Offshore Chapter 6 Offshore Water Quality Offshore Water Quality Chapter |
Other | 6.1.2.7 Volume B Offshore Chapter 7 Offshore Air Quality Offshore Air Quality Chapter |
Other | 6.1.2.8 Volume B Offshore Chapter 8 In Air Noise In-Air Noise Chapter |
Other | 6.1.2.9 Volume B Offshore Chapter 9 Benthic Ecology Benthic Ecology Chapter |
Other | 6.1.2.10 Volume B Offshore Chapter 10 Fish and Shellfish Ecology Fish & Shellfish Ecology Chapter |
Other | 6.1.2.11 Volume B Offshore Chapter 11 Marine Mammals Marine Mammals Chapter |
Other | 6.1.2.12 Volume B Offshore Chapter 12 Offshore Ornithology Offshore Ornithology Chapter |
Other | |
Other | 6.1.2.14 Volume B Offshore Chapter 14 Offshore Archaeology Offshore Archaeology Chapter |
Other | 6.1.2.15 Volume B Offshore Chapter 15 Setting of Heritage Assets Setting of Heritage Assets Chapter |
Other | 6.1.2.16 Volume B Offshore Chapter 16 Shipping and Navigation Shipping and Navigation Chapter |
Other | 6.1.2.17 Volume B Offshore Chapter 17 Commercial Fisheries Commercial Fisheries Chapter |
Other | 6.1.2.18 Volume B Offshore Chapter 18 Aviation and Military Activity Aviation and Military Activity Chapter |
Other | 6.1.2.19 Volume B Offshore Chapter 19 Other Offshore Infrastructure Other Offshore Infrastructure Chapter |
Other | 6.1.2.20 Volume B Offshore Chapter 20 Telecommunications and Broadcasting Telecommunications and Broadcasting Chapter |
Other | 6.1.3.1 Volume C Onshore Chapter 1 Onshore Introduction Onshore Introduction Chapter |
Other | 6.1.3.10Volume C Onshore Chapter 10 Terrestrial and Freshwater Ecology Terrestrial and Freshwater Ecology Chapter |
Other | 6.1.3.11Volume C Onshore Chapter 11 Onshore Ornithology Onshore Ornithology Chapter |
Other | 6.1.3.12 Volume C Onshore Chapter 12 Landscape and Visual Landscape and Visual Chapter |
Other | 6.1.3.13 Volume C Onshore Chapter 13 Onshore Cultural Heritage and Archaeology Onshore Cultural Heritage and Archaeology Chapter |
Other | 6.1.3.14 Volume C Onshore Chapter 14 Traffic and Transportation Traffic and Transportation Chapter |
Other | 6.1.3.2 Volume C Onshore Chapter 2 Onshore Project Description Onshore Project Description Chapter |
Other | 6.1.3.3 Volume C Onshore Chapter 3 Onshore Legislation and Policy Onshore Legislation and Policy Chapter |
Other | 6.1.3.4 Volume C Onshore Chapter 4 Onshore Alternatives Onshore Alternatives Chapter |
Other | 6.1.3.5 Volume C Onshore Chapter 5 Ground Conditions and Contaminated Land Ground Conditions and Contaminated Land Chapter |
Other | 6.1.3.6 Volume C Onshore Chapter 6 Soils and Land Use Soils and Land Use Chapter |
Other | 6.1.3.7 Volume C Onshore Chapter 7 Onshore Water Environment Onshore Water Environment Chapter |
Other | 6.1.3.8 Volume C Onshore Chapter 8 Onshore Air Quality Onshore Air Quality Chapter |
Other | 6.1.3.9 Volume C Onshore Chapter 9 Noise and Vibration Noise and Vibration Chapter |
Other | 6.1.4.1 Volume D Project Wide Assessment Chapter 1 Project Wide Assessment Introduction Project-wide Introduction Chapter |
Other | 6.1.4.2 Volume D Project Wide Assessment Chapter 2 Nature Conservation Designations Nature Conservation Designations Chapter |
Other | 6.1.4.3 Volume D Project Wide Assessment Chapter 3 Socio Economics and Tourism Socio-economics and Tourism Chapter |
Other | 6.1.4.4 Volume D Project Wide Assessment Chapter 4 Recreation Recreation Chapter |
Other | 6.1.4.5 Volume D Project Wide Assessment Chapter 5 World Heritage Site World Heritage Site Chapter |
Other | 6.1.4.6 Volume D Project Wide Assessment Chapter 6 Interrelationship Impacts Interrelationships Impacts Chapter |
Other | 6.1.4.7 Volume D Project Wide Assessment Chapter 7 Transboundary Impacts Transboundary Impacts Chapter |
Other | 6.2.1.3.1 Volume A Chapter 3 Legislation and Policy Appendix 3.1 "Legislation and Policy Appendix 3.1 International |
Other | 6.2.1.4.1 Volume A Chapter 4 Consultations Appendix 4.1 Consultations Appendix 4.1 Scoping Report |
Other | 6.2.2.10.1 Volume B Chapter 10 Fish and Shellfish Ecology Appendix 10.1 Fish and Shellfish Ecology Appendix 10.1 Fish and Shellfish Ecology Characterisation Report |
Other | 6.2.2.10.2 Volume B Chapter 10 Fish and Shellfish Ecology Appendix 10.2 Fish and Shellfish Ecology Appendix 10.2 Subsea Noise Technical Report |
Other | 6.2.2.11.1 Volume B Chapter 11 Marine Mammals Appendix 11.1 Marine Mammals Appendix 11.1 Marine Mammals Baseline Data Review |
Other | 6.2.2.11.2 Volume B Chapter 11 Marine Mammals Appendix 11.2 Marine Mammals Appendix 11.2 Durlston Project Marine Mammal Database |
Other | 6.2.2.11.3 Volume B Chapter 11 Marine Mammals Appendix 11.3 Marine Mammals Appendix 11.3 CPOD Static Acoustic Monitoring of Harbour Porpoises and Dolphins |
Other | 6.2.2.11.4 Volume B Chapter 11 Marine Mammals Appendix 11.4 Marine Mammal Noise Impact Assessment Marine Mammals Appendix 11.4 Marine Mammal Noise Impact Assessment |
Other | 6.2.2.12.1 Volume B Chapter 12 Offshore Ornithology Appendix 12.1 Offshore Ornithology Appendix 12.1 Baseline Offshore Ornithology Assessment |
Other | 6.2.2.12.2 Volume B Chapter 12 Offshore Ornithology Appendix 12.2 Offshore Ornithology Appendix 12.2 Waterbird Migration Modelling Report |
Other | 6.2.2.12.3 Volume B Chapter 12 Offshore Ornithology Appendix 12.3 Offshore Ornithology Appendix 12.3 Offshore Ornithology Displacement Matrices |
Other | 6.2.2.12.4 Volume B Chapter 12 Offshore Ornithology Appendix 12.4 Offshore Ornithology Appendix 12.4 Offshore Ornithology Collision Risk Modelling |
Other | 6.2.2.12.5 Volume B Chapter 12 Offshore Ornithology Appendix 12.5 Offshore Ornithology Appendix 12.5 Seabird Migration Modelling Report |
Other | 6.2.2.12.6 Volume B Chapter 12 Offshore Ornithology Appendix 12.6 Offshore Ornithology Appendix 12.6 Revised Population Estimates for Grouped Seabirds |
Other | 6.2.2.12.7 Volume B Chapter 12 Offshore Ornithology Appendix 12.7 Offshore Ornithology Appendix 12.7 Agreed Seabird Biological Periods |
Other | 6.2.2.12.8 Volume B Chapter 12 Offshore Ornithology Appendix 12.8 Offshore Ornithology Appendix 12.8 Additional Modelling Support for Nightjar |
Other | 6.2.2.12.9 Volume B Chapter 12 Offshore Ornithology Appendix 12.9 Offshore Ornithology Appendix 12.9 Migropath Species Selection Matrix |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | 6.2.2.13.35 Volume B Chapter 13 Seascape Landscape and Visual Viewpoint 9 Durlston Castle Durlston Head 5 MW Night Time Photomontage Viewpoint 9 Durlston Castle Durlston Head (5 MW) Night Time Photomontage |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | 6.2.2.2.1 Volume B Chapter 2 Offshore Project Description Appendix 2.1 Offshore Project Description Appendix 2.1 EMF Calculations Report |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | 6.2.2.14.1 Volume B Chapter 14 Offshore Archaeology Appendix 14.1 Offshore Archaeology Appendix 14.1 Offshore Archaeological Technical Report |
Other | 6.2.2.14.2 Volume B Chapter 14 Offshore Archaeology Appendix 14.2 Offshore Archaeology Appendix 14.2 Offshore Archaeological Written Scheme of Investigation |
Other | 6.2.2.15.1 Volume B Chapter 15 Setting of Heritage Impacts Appendix 15.1 Setting of Heritage Impacts Appendix 15.1 Cultural Setting Technical Report |
Other | 6.2.2.16.1 Volume B Chapter 16 Shipping and Navigation Appendix 16.1 Shipping and Navigation Appendix 16.1 Navigation Risk Assessment |
Other | 6.2.2.17.1 Volume B Chapter 17 Commercial Fisheries Appendix 17.1 Commercial Fisheries Appendix 17.1 Baseline Report |
Other | 6.2.2.18.1 Volume B Chapter 18 Aviation and Military Activity Appendix 18.1 Aviation and Military Activity Appendix 18.1 Technical Report |
Other | 6.2.2.20.1 Volume B Chapter 20 Telecommunications and Broadcasting Appendix 20.1 Telecommunications and Broadcasting Appendix 20.1 Television Desk Study Assessment and Baseline Survey |
Other | 6.2.2.5.2 Volume B Chapter 5 Physical Processes Appendix 5.2 Physical Processes Appendix 5.2 Baseline Geological Characterisation |
Other | 6.2.2.5.1 Volume B Chapter 5 Physical Processes Appendix 5.1 Physical Processes Appendix 5.1 Physical Processes Assessment Report |
Other | 6.2.2.5.3 Volume B Chapter 5 Physical Processes Appendix 5.3 Physical Processes Appendix 5.3 Micro Climate Report |
Other | 6.2.2.5.4 Volume B Chapter 5 Physical Processes Appendix 5.4 Physical Processes Appendix 5.4 Impact on the Microclimate Effects for Other Sea Users |
Other | 6.2.2.5.5 Volume B Chapter 5 Physical Processes Appendix 5.5 Physical Processes Appendix 5.5 Fog Micro Climate Assessment |
Other | 6.2.2.6.1 Volume B Chapter 6 Offshore Water Quality Appendix 6.1 Offshore Water Quality Appendix 6.1 Water and Sediment Quality Technical Report |
Other | 6.2.2.8.1 Volume B Chapter 8 In Air Noise Appendix 8.1 In-Air Noise Appendix 8.1 In Air Noise Technical Report |
Other | 6.2.2.9.1 Volume B Chapter 9 Benthic Ecology Appendix 9.1 Benthic Ecology Appendix 9.1 Benthic Ecology Characterisation Technical Report |
Other | 6.2.2.9.2 Volume B Chapter 9 Benthic Noise Appendix 9.2 Benthic Noise Appendix 9.2 Intertidal Ecology Characterisation |
Other | 6.2.3.10.1 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.1 Terrestrial and Freshwater Ecology Appendix 10.1 Consolidated Phase 1 Habitat Survey |
Other | 6.2.3.10.2 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.2 Terrestrial and Freshwater Ecology Appendix 10.2 Hedgerow Survey |
Other | 6.2.3.10.3 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.3 Terrestrial and Freshwater Ecology Appendix 10.3 National Vegetation Classification Survey at West Moors Ministry of Defence Area |
Other | 6.2.3.10.4 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.4 Terrestrial and Freshwater Ecology Appendix 10.4 Conservation Notable Species . Ecology Surveys |
Other | 6.2.3.10.5 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.5 Terrestrial and Freshwater Ecology Appendix 10.5 Hurn Forest and West Moors Plantation Reptile Survey |
Other | 6.2.3.10.6 Volume C Chapter 10 Terrestrial and Freshwater Ecology Appendix 10.6 Terrestrial and Freshwater Ecology Appendix 10.6 Arboricultural Walkover Survey |
Other | 6.2.3.11.1 Volume C Chapter 11 Onshore Ornithology Appendix 11.1 Onshore Ornithology Appendix 11.1 Bird Species Evaluation Table |
Other | 6.2.3.11.2 Volume C Chapter 11 Onshore Ornithology Appendix 11.2 Onshore Ornithology Appendix 11.2 Onshore Wintering Bird Survey Report |
Other | 6.2.3.11.3 Volume C Chapter 11 Onshore Ornithology Appendix 11.3 Onshore Ornithology Appendix 11.3 2012 Breeding Bird Survey Report |
Other | 6.2.3.11.4 Volume C Chapter 11 Onshore Ornithology Appendix 11.4 Onshore Ornithology Appendix 11.4 2013 Breeding Bird Survey Report |
Other | 6.2.3.2.1 Volume C Chapter 2 Onshore Project Description Appendix 2.1 Onshore Project Description Appendix 2.1 EMF Study |
Other | 6.2.3.2.2 Volume C Chapter 2 Onshore Project Description Appendix 2.2 Onshore Project Description Appendix 2.2 HDD methodology for crossing statutory designated habitats |
Other | 6.2.3.5.1 Volume C Chapter 5 Ground Conditions Appendix 5.1 Ground Conditions Appendix 5.1 Landfall Site Phase 1 Ground Stability and Contaminated Land Report |
Other | 6.2.3.5.2 Volume C Chapter 5 Ground Conditions Appendix 5.2 Part 1 Ground Conditions Appendix 5.2 Cable Route Phase 1 Ground Stability and Contamination Report Part 1 |
Other | 6.2.3.5.3 Volume C Chapter 5 Ground Conditions Appendix 5.2 Part 2 Ground Conditions Appendix 5.2 Cable Route Phase 1 Ground Stability and Contamination Report Part 2 |
Other | 6.2.3.5.4 Volume C Chapter 5 Ground Conditions Appendix 5.2 Part 3 Ground Conditions Appendix 5.2 Cable Route Phase 1 Ground Stability and Contamination Report Part 3 |
Other | 6.2.3.5.5 Volume C Chapter 5 Ground Conditions Appendix 5.2 Part 4 Ground Conditions Appendix 5.2 Cable Route Phase 1 Ground Stability and Contamination Report Part 4 |
Other | 6.2.3.12.1 Volume C Chapter 12 Landscape and Visual Viewpoint 1 Gundrys Farm Landscape and Visual Viewpoint 1 Gundrys Farm wireframe and photomontages Year 1 and Year 15 |
Other | 6.2.3.12.2 Volume C Chapter 12 Landscape and Visual Viewpoint 2 Public Footpath to the North of Sturts Farm Landscape and Visual Viewpoint 2 Public Footpath to the North of Sturts Farm wireframe and photomontage |
Other | 6.2.3.12.3 Volume C Chapter 12 Landscape and Visual Viewpoint 3 Bridleway to the North of Woolsbridge Industrial Estate Landscape and Visual Viewpoint 3 Bridleway to the North of Woolsbridge Industrial Estate wireframe and photomontage |
Other | 6.2.3.12.4 Volume C Chapter 12 Landscape and Visual Viewpoint 4 Public Footpath on Holt Heath Landscape and Visual Viewpoint 4 Public Footpath on Holt Heath wireframe and photomontage |
Other | 6.2.3.12.5 Volume C Chapter 12 Landscape and Visual Viewpoint 5 Bridleway on Horton Common Landscape and Visual Viewpoint 5 Bridleway on Horton Common wireframe and photomontage |
Other | 6.2.3.12.6 Volume C Chapter 12 Landscape and Visual Viewpoint 6 Redmans Hill Landscape and Visual Viewpoint 6 Redmans Hill wireframe and photomontage |
Other | 6.2.3.12.7 Volume C Chapter 12 Landscape and Visual Appendix 12.3 Landscape and Visual Appendix 12.3 LVIA Methodology |
Other | 6.2.3.12.8 Volume C Chapter 12 Landscape and Visual Appendix 12.4 Landscape and Visual Appendix 12.4 Methodology for Preparation of Visuals |
Other | 6.2.3.12.9 Volume C Chapter 12 Landscape and Visual Appendix 12.5 Landscape and Visual Appendix 12.5 GLVIA 2 and 3 comparison study |
Other | 6.2.3.13.1 Volume C Chapter 14 Onshore Cultural Heritage Appendix 13.1 Onshore Cultural Heritage and Archaeology Appendix 13.1 Onshore Cable Route Heritage Desk Based Assessment |
Other | 6.2.3.14.1 Volume C Chapter 14.1 Traffic and Transportation Appendix 14.1 Traffic and Transportation Appendix 14.1 Transport Assessment |
Other | 6.2.3.14.2 Volume C Chapter 14.1 Traffic and Transportation Appendix 14.2 Traffic and Transportation Appendix 14.2 Construction Routing and Access Assessment |
Other | 6.2.3.14.3 Volume C Chapter 14.1 Traffic and Transportation Appendix 14.3 Traffic and Transportation Appendix 14.3 ES Impact Assessment |
Other | 6.2.3.5.6 Volume C Chapter 5 Ground Conditions Appendix 5.2 Part 5 Ground Conditions Appendix 5.2 Cable Route Phase 1 Ground Stability and Contamination Report Part 5 |
Other | 6.2.3.5.7 Volume C Chapter 5 Ground Conditions Appendix 5.3 Part 1 Ground Conditions Appendix 5.3 Substation Phase 1 Ground Stability and Contaminated Land Report Part 1 |
Other | 6.2.3.5.8 Volume C Chapter 5 Ground Conditions Appendix 5.3 Part 2 Ground Conditions Appendix 5.3 Substation Phase 1 Ground Stability and Contaminated Land Report Part 2 |
Other | 6.2.3.6.1 Volume C Chapter 6 Soils and Land Use Appendix 6.1 Soils and Land Use Appendix 6.1 Desk Study Report |
Other | 6.2.3.7.1 Volume C Chapter 7 Onshore Water Environment Appendix 7.1 Onshore Water Environment Appendix 7.1 Substation Flood Risk Assessment |
Other | 6.2.3.7.2 Volume C Chapter 7 Onshore Water Environment Appendix 7.2 Onshore Water Environment Appendix 7.2 Cable Route Water Environment Baseline Assessment Desk Study |
Other | 6.2.3.7.3 Volume C Chapter 7 Onshore Water Environment Appendix 7.3 Onshore Water Environment Appendix 7.3 Schedule of Watercourse Crossings |
Other | 6.2.3.9.1 Volume C Chapter 9 Onshore Noise Appendix 9.1 Onshore Noise Appendix 9.1 Onshore Noise and Vibration Assessment |
Other | 6.2.4.3.1 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.1 Socio-Economics and Tourism Appendix 3.1 Summer 2012 Visitor Survey |
Other | 6.2.4.3.2 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.2 Socio-Economics and Tourism Appendix 3.2 Supply Chain Analysis |
Other | 6.2.4.3.3 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.3 Socio-Economics and Tourism Appendix 3.3 Socio-economics and Tourism Baseline Report |
Other | 6.2.4.3.4 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.4 Socio-Economics and Tourism Appendix 3.4 Spring 2013 Visitor Survey |
Other | 6.2.4.3.5 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.5 Socio-Economics and Tourism Appendix 3.5 Local Strategy and Policy Review |
Other | 6.2.4.3.6 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.6 Socio-Economics and Tourism Appendix 3.6 Survey of Facilities |
Other | 6.2.4.3.7 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.7 Socio-Economics and Tourism Appendix 3.7 Design Visual Calibration Study 2013 |
Other | 6.2.4.3.8 Volume D Chapter 3 Socio Economics and Tourism Appendix 3.8 Socio-Economics and Tourism Appendix 3.8 Design Visual Calibration Study 2014 |
Other | 6.2.4.4.1 Volume D Chapter 4 Recreation Appendix 4.1 Recreation Appendix 4.1 Recreation Survey Report |
Other | 6.2.4.5.1 Volume D Chapter 5 World Heritage Site Appendix 5.1 World Heritage Site Appendix 5.1 Alternative Approach |
Other | 6.2.4.7.1 Volume D Chapter 7 Transboundary Impacts Appendix 7.1 Transboundary Impacts Appendix 7.1 Transboundary Matrix |
Other | 6.3 NonTechnical Summary Non-Technical Summary |
Other | 6.4 IPC Scoping Opinion IPC Scoping Opinion |
Other | 6.5 Schedule of Mitigation Schedule of Mitigation |
Other | 8.7 Outline Diver Management Plan Outline Diver Management Plan |
Other | 8.1 Offshore Illustrative Drawings Offshore Illustrative Drawings |
Other | 8.2 Design and Access Statement Design and Access Statement |
Other | 8.3 Public Rights of Way Strategy Public Rights of Way Strategy |
Other | 8.4 Planning Statement Planning Statement |
Other | 8.5 Code of Construction Practice Code of Construction Practice |
Other | 8.6 Outline Marine Traffic and Navigational Monitoring Strategy Outline Marine Traffic and Navigational Monitoring Strategy |
Other | 2.4 Works Plan Key Plan Works Plan (Key Plan) |
Other | 2.4 Works Plan Offshore Works Plan (Offshore) |
Other | 2.4 Works Plan Onshore Works Plan (Onshore) |
Other | 2.5 Trenchless Crossings Plan Key Plan Trenchless Crossings Plan (Key Plan) |
Other | 2.5 Trenchless Crossings Plan Trenchless Crossings Plan |
Other | 2.6 Access to Works Plan Key Plan Access to Works Plan (Key Plan) |
Other | 2.6 Access to Works Plan Access to Works Plan |
Other | 2.7 Streets Subject to Street Works Plan Key Plan Streets Subject to Street Works Plan (Key Plan) |
Other | 2.1 Location Plan Location Plan |
Other | 2.2 Land Plan Key Plan Land Plan (Key Plan) |
Other | 2.2 Land Plan Offshore Land Plan (Offshore) |
Other | 2.2 Land Plan Onshore Land Plan (Onshore) |
Other | 2.3 Special Category Land Plan Key Plan Special Category Land Plan (Key Plan) |
Other | 2.3 Special Category Land Plan Special Category Land Plan |
Other | 2.10 Extinguishment of Public Rights of Navigation Plan Extinguishment of Public Rights of Navigation Plan |
Other | 2.11 Statutory or Non Statutory Sites or Features of Nature Conservation Plan Key Plan Statutory or Non-Statutory Sites or Features of Nature Conservation Plan (Key Plan) |
Other | 2.11 Statutory or Non Statutory Sites or Features of Nature Conservation Plan Offshore Statutory or Non-Statutory Sites or Features of Nature Conservation Plan (Offshore) |
Other | 2.11 Statutory or Non Statutory Sites or Features of Nature Conservation Plan Onshore Statutory or Non-Statutory Sites or Features of Nature Conservation Plan (Onshore) |
Other | 2.12 Sites or Features of the Historic Environment Plan Key Plan "Statutory or Non-Statutory Historic or Scheduled Monuments |
Other | 2.12 Sites or Features of the Historic Environment Plan Offshore "Statutory or Non-Statutory Historic or Scheduled Monuments |
Other | 2.12 Sites or Features of the Historic Environment Plan Onshore "Statutory or Non-Statutory Historic or Scheduled Monuments |
Other | 2.13 Crown Land Plan Key Plan Crown Land Plan (Key Plan) |
Other | 2.13 Crown Land Plan Offshore Crown Land Plan (Offshore) |
Other | 2.13 Crown Land Plan Onshore Crown Land Plan (Onshore) |
Other | 2.14 Open Access Land Plan Key Plan Open Access Land Plan (Key Plan) |
Other | 2.14 Open Access Land Plan Open Access Land Plan |
Other | 2.15 Important Hedgerows Plan Key Plan Important Hedgerows Plan (Key Plan) |
Other | 2.15 Important Hedgerows Plan Important Hedgerows Plan |
Other | 2.16 Tree Preservation Order Plan Key Plan Tree Preservation Order Plan (Key Plan) |
Other | 2.16 Tree Preservation Order Plan Tree Preservation Order Plan |
Other | 2.7 Streets Subject to Street Works Plan Streets Subject to Street Works Plan |
Other | 2.8 Streets to be Temporarily Stopped Up Plan Key Plan Streets to be Temporarily Stopped Up Plan (Key Plan) |
Other | 2.8 Streets to be Temporarily Stopped Up Plan Streets to be Temporarily Stopped Up Plan |
Other | 2.9 Public Rights of Way to be Temporarily Stopped Up Plan Key Plan Public Rights of Way to be Temporarily Stopped Up Plan (Key Plan) |
Other | 2.9 Public Rights of Way to be Temporarily Stopped Up Plan Public Rights of Way to be Temporarily Stopped Up Plan |
Other | 5.1 Consultation Report Consultation Report |
Other | 5.1.1 Consultation Report Appendices A to C Consultation Report Appendices A to C |
Other | 5.1.2 Consultation Report Appendices D to E Consultation Report Appendices D to E |
Other | 5.1.3 Consultation Report Appendices F to H Consultation Report Appendices F to H |
Other | 5.1.4 Consultation Report Appendix I Consultation Report Appendix I |
Other | 5.1.5 Consultation Report Appendices J to K Consultation Report Appendices J to K |
Other | 5.1.6 Consultation Report Appendix L Consultation Report Appendix L |
Other | 5.2 Statement of Engagement with Environmental Protection Act 1990 Statement of Engagement with Environmental Protection Act 1990 |
Other | 5.3 Habitat Regulations Assessment Screening Report Habitat Regulations Assessment Screening Report |
Other | 5.4 Habitat Regulations Assessment Report Habitat Regulations Assessment Report |
Other | 5.5 Consents and Licences required under other Legislation Consents and Licences required under other Legislation |
Other | |
Other | 130517 EN010024 s53 Land Parcel 28 DOC 28(F) Copy of the cover letters sent to landowners, as referred to in PINS email dated 16 May 2013 (Doc 28(E)) |
Other | 130514 EN010024 s53 Land Parcel 28 Doc 28(C) Email from PINS to the applicant querying whether the supplemental information provided in the Applicant’s letter dated 10 May (Doc 28(B)) was also sent to the landowner |
Other | 130516 EN010024 s53 Land Parcel 28 Doc 28(D) Applicant’s response to PINS email dated 14 May 2013 (Doc 28(C)) |
Other | 130516 EN010024 s53 Land Parcel 28 Doc 28(E) PINS response to the applicant’s email dated 16 May 2013 (Doc 28(D)) |
Other | 130503 EN010024 s53 Land Parcel 28 Doc 28(A) Section 53 authorisation request for Land Parcel 28. Submitted by the applicant on 3 May 2013 |
Other | 130611 EN010024 s53 Land Parcel 28 DOC 28(G) PINS further information request for Land Parcel 28 |
Other | 130510 EN010024 s53 Land Parcel 28 Doc 28(B) Additional information and clarification of the correspondence relevant to each of the section 53 authorisation requests made on 3 May 2013 |
Other | 130705 EN010024 s53 Land Parcel 28 DOC 28(H) Appendices Appendices to applicant's further information response for Land Parcel 28 |
Other | 130705 EN010024 s53 Land Parcel 28 DOC 28(H) Applicant's response to further information request for Land Parcel 28 |
Other | 130806 EN010024 Land Parcel 28 Doc 28(J) Email correspondence between the Planning Inspectorate and the Applicant updating on the progress made with landowners |
Other | 130819 EN010024 s53 Land Parcel 28 DOC 28(K) Applicant's response to second further information request for Land Parcel 28 |
Other | 130905 EN010024 s53 Land Parcel 28 Doc 28(L) Email update from the applicant confirming they wish to continue with the s53 authorisation request |
Other | 130730 EN010024 s53 Land Parcel 28 DOC 28(I) PINS second further information request for Land Parcel 28 |
Other | 131001 EN010024 s53 Land Parcel 28 Authorisation Notice The Section 53 authorisation notice for Land Parcel 28 |
Other | 130920 EN010024 s53 Land parcel 28 Schedule of Correspondence A schedule detailing the correspondence between the applicant and the Planning Inspectorate regarding the Section 53 authorisation request for Land Parcel 28 |
Other | 130920 EN010024 s53 Land Parcel 28 Recommendation Report The Planning Inspectorate recommendation report submitted to the Secretary of State for Land Parcel 28 |
Other | 130517 EN010024 s53 Land Parcel 29 DOC 29(F) Copy of the cover letters sent to landowners, as referred to in PINS email dated 16 May 2013 (Doc 29(E)) |
Other | 130611 EN010024 s53 Land Parcel 29 DOC 29(G) PINS further information request for Land Parcel 29 |
Other | 130514 EN010024 s53 Land Parcel 29 Doc 29(C) Email from PINS to the applicant querying whether the supplemental information provided in the Applicant’s letter dated 10 May (Doc 29(B)) was also sent to the landowner |
Other | 130516 EN010024 s53 Land Parcel 29 Doc 29(D) Applicant’s response to PINS email dated 14 May 2013 (Doc 29(C)) |
Other | 130510 EN010024 s53 Land Parcel 29 Doc 29(B) Additional information and clarification of the correspondence relevant to each of the section 53 authorisation requests made on 3 May 2013 |
Other | 130516 EN010024 s53 Land Parcel 29 Doc 29(E) PINS response to the applicant’s email dated 16 May 2013 (Doc 29(D)) |
Other | 130510 EN010024 s53 Land Parcel 29 Doc 29(B1) Additional correspondence referred to by the applicant in Doc 29(B) |
Other | 130503 EN010024 s53 Land Parcel 29 Doc 29(A) Section 53 authorisation request for Land Parcel 29. Submitted by the applicant on 3 May 2013 |
Other | 130705 EN010024 s53 Land Parcel 29 DOC 29(H) Applicant's response to further information request for Land Parcel 29 |
Other | 130705 EN010024 s53 Land Parcel 29 DOC 29(H) Appendices Appendices to applicant's further information response for Land Parcel 29 |
Other | 130806 EN010024 Land Parcel 29 Doc 29(J) Email correspondence between the Planning Inspectorate and the Applicant updating on the progress made with landowners |
Other | 130920 EN010024 s53 Land parcel 29 Schedule of Correspondence A schedule detailing the correspondence between the applicant and the Planning Inspectorate regarding the Section 53 authorisation request for Land Parcel 29 |
Other | 130920 EN010024 s53 Land Parcel 29 Recommendation Report The Planning Inspectorate recommendation report submitted to the Secretary of State for Land Parcel 29 |
Other | 131001 EN010024 s53 Land Parcel 29 Authorisation Notice The Section 53 authorisation notice for Land Parcel 29 |
Other | 130514 EN010024 s53 Land Parcel 27.1 Doc 27.1(C) Email from PINS to the applicant querying whether the supplemental information provided in the Applicant’s letter dated 10 May (Doc 27.1(B)) was also sent to the landowner |
Other | 130611 EN010024 s53 Land Parcel 27.1 DOC 27.1(G) PINS further information request for Land Parcel 27.1 |
Other | 130516 EN010024 s53 Land Parcel 27.1 Doc 27.1(D) Applicant’s response to PINS email dated 14 May 2013 (Doc 27.1(C)) |
Other | 130516 EN010024 s53 Land Parcel 27.1 Doc 27.1(E) PINS response to the applicant’s email dated 16 May 2013 (Doc 27.1(D)) |
Other | 130510 EN010024 s53 Land Parcel 27.1 Doc 27.1(B) Additional information and clarification of the correspondence relevant to each of the section 53 authorisation requests made on 3 May 2013 |
Other | 130503 EN010024 s53 Land Parcel 27.1 Doc 27.1(A) Section 53 authorisation request for Land Parcel 27.1. Submitted by the applicant on 3 May 2013 |
Other | 130517 EN010024 s53 Land Parcel 27.1 DOC 27.1(F) Copy of the cover letters sent to landowners, as referred to in PINS email dated 16 May 2013 (Doc 27.1(E)) |
Other | 130705 EN010024 s53 Land Parcel 27.1 DOC 27.1(H) Applicant's response to further information request for Land Parcel 27.1 |
Other | 130705 EN010024 s53 Land Parcel 27.1 DOC 27.1(H) Appendices Appendices to applicant's further information response for Land Parcel 27.1 |
Other | 130806 EN010024 Land Parcel 27.1 Doc 27.1(I) Email correspondence between the Planning Inspectorate and the Applicant updating on the progress made with landowners |
Other | 130814 EN010024 s53 Land parcel 27.1 Schedule of Correspondence A schedule detailing the correspondence between the applicant and the Planning Inspectorate regarding the Section 53 authorisation request for Land Parcel 27.1. |
Other | 130814 EN010024 s53 Land Parcel 27.1 Authorisation Notice The Section 53 authorisation notice for Land Parcel 27.1. |
Other | 130814 EN010024 s53 Land Parcel 27.1 Recommendation Report The Planning Inspectorate's recommendation report submitted to the Secretary of State regarding the Section 53 authorisation request for Land Parcel 27.1. |
Other | 130514 EN010024 s53 Land Parcel 27.2 Doc 27.2(C) Email from PINS to the applicant querying whether the supplemental information provided in the Applicant’s letter dated 10 May (Doc 27.2(B)) was also sent to the landowner |
Other | 130510 EN010024 s53 Land Parcel 27.2 Doc 27.2(B) Additional information and clarification of the correspondence relevant to each of the section 53 authorisation requests made on 3 May 2013 |
Other | 130516 EN010024 s53 Land Parcel 27.2 Doc 27.2(D) Applicant’s response to PINS email dated 14 May 2013 (Doc 27.2(C)) |
Other | 130503 EN010024 s53 Land Parcel 27.2 Doc 27.2(A) Section 53 authorisation request for Land Parcel 27.2. Submitted by the applicant on 3 May 2013 |
Other | 130611 EN010024 s53 Land Parcel 27.2 DOC 27.2(G) PINS further information request for Land Parcel 27.2 |
Other | 130516 EN010024 s53 Land Parcel 27.2 Doc 27.2(E) PINS response to the applicant’s email dated 16 May 2013 (Doc 27.2(D)) |
Other | 130517 EN010024 s53 Land Parcel 27.2 DOC 27.2(F) Copy of the cover letters sent to landowners, as referred to in PINS email dated 16 May 2013 (Doc 27.2(E)) |
Other | 130705 EN010024 s53 Land Parcel 27.2 DOC 27.2(H) Appendices Appendices to applicant's further information response for Land Parcel 27.2 |
Other | 130705 EN010024 s53 Land Parcel 27.2 DOC 27.2(H) Applicant's response to further information request for Land Parcel 27.2 |
Other | 130806 EN010024 Land Parcel 27.2 Doc 27.2(I) Email correspondence between the Planning Inspectorate and the Applicant updating on the progress made with landowners |
Other | 130814 EN010024 s53 Land Parcel 27.2 Authorisation Notice The Section 53 authorisation notice for Land Parcel 27.2. |
Other | 130814 EN010024 s53 Land parcel 27.2 Schedule of Correspondence A schedule detailing the correspondence between the applicant and the Planning Inspectorate regarding the Section 53 authorisation request for Land Parcel 27.2. |
Other | 130814 EN010024 s53 Land Parcel 27.2 Recommendation Report The Planning Inspectorate's recommendation report submitted to the Secretary of State regarding the Section 53 authorisation request for Land Parcel 27.2. |
Other | 130611 EN010024 s53 Land Parcel 27.3 DOC 27.3(G) PINS further information request for Land Parcel 27.3 |
Other | 130503 EN010024 s53 Land Parcel 27.3 Doc 27.3(A) Section 53 authorisation request for Land Parcel 27.3. Submitted by the applicant on 3 May 2013 |
Other | 130514 EN010024 s53 Land Parcel 27.3 Doc 27.3(C) Email from PINS to the applicant querying whether the supplemental information provided in the Applicant’s letter dated 10 May (Doc 27.3(B)) was also sent to the landowner |
Other | 130516 EN010024 s53 Land Parcel 27.3 Doc 27.3(D) Applicant’s response to PINS email dated 14 May 2013 (Doc 27.3(C)) |
Other | 130517 EN010024 s53 Land Parcel 27.3 DOC 27.3(F) Copy of the cover letters sent to landowners, as referred to in PINS email dated 16 May 2013 (Doc 27.3(E)) |
Other | 130510 EN010024 s53 Land Parcel 27.3 Doc 27.3(B) Additional information and clarification of the correspondence relevant to each of the section 53 authorisation requests made on 3 May 2013 |
Other | 130516 EN010024 s53 Land Parcel 27.3 Doc 27.3(E) PINS response to the applicant’s email dated 16 May 2013 (Doc 27.3(D)) |
Other | 130705 EN010024 s53 Land Parcel 27.3 DOC 27.3(H) Appendices Appendices to applicant's further information response for Land Parcel 27.3 |
Other | 130705 EN010024 s53 Land Parcel 27.3 DOC 27.3(H) Applicant's response to further information request for Land Parcel 27.3 |
Other | 130806 EN010024 Land Parcel 27.3 Doc 27.3(I) Email correspondence between the Planning Inspectorate and the Applicant updating on the progress made with landowners |
Other | 130814 EN010024 s53 Land Parcel 27.3 Recommendation Report The Planning Inspectorate's recommendation report submitted to the Secretary of State regarding the Section 53 authorisation request for Land Parcel 27.3. |
Other | 130814 EN010024 s53 Land Parcel 27.3 Authorisation Notice The Section 53 authorisation notice for Land Parcel 27.3. |
Other | 130814 EN010024 s53 Land parcel 27.3 Schedule of Correspondence A schedule detailing the correspondence between the applicant and the Planning Inspectorate regarding the Section 53 authorisation request for Land Parcel 27.3. |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | |
Other | 110922 EN010024 835877 Scoping report Scoping report submitted to the IPC on 22 September 2011 |
Other | 111101 EN010024 Late responses Scoping consultation responses received after the 28 day deadlines |
Other | 111101 EN010024 853170 Scoping Opinion The IPC's Scoping Opinion issued on 01 November 2011 |
Documents can be filtered by the date they were published or by the deadline date that they relate to. Deadlines are publicised in the examination timetable at the beginning of the examination and can be viewed on the examination timetable tab.