Below is a list of all applications received by the Planning Inspectorate and, formerly, by the Infrastructure Planning Commission. This register is required in accordance with Section 39 of the Planning Act 2008. Click on the links to view further information and documents for each project including adequacy of consultation representations and the decision to accept the application for examination. The environmental documents such as screening and scoping opinions can be accessed from within the documentation area of the relevant project page.
Application | Location | Developer | Date Of application submission | Date of acceptance/non-acceptance for examination | Follow on Twitter | Status | Submission date |
---|---|---|---|---|---|---|---|
Burbo Bank Extension offshore wind farm | Liverpool Bay NW of Wirral Coast | DONG Energy Burbo Extension (UK) Ltd. | 22/03/2013 | 19/04/2013 | BurboBank | Examination | 2013-03-22 |
Daventry International Rail Freight Terminal | Former Rugby Radio Station | Rugby Radio Station Ltd Partnership & Prologis UK | 22/02/2013 | 20/03/2013 | DaventryIRFT | Examination | 2013-02-22 |
Able Marine Energy Park | Killingholme, Humberside | Able Humber Ports Ltd | 19/12/2011 | 12/01/2012 | AbleMarinePark | Decision | 2011-12-19 |
Port Blyth New Biomass Plant | Port Blyth in Northumberland | North Blyth Energy Ltd | 15/03/2012 | 11/04/2012 | PortBlyth | DCO granted on 24/07/2013 | 2012-03-15 |
Dogger Bank Creyke Beck | Yorkshire and Humber | Forewind | 29/08/2013 | 25/09/2013 | DoggerBankCB | Pre-examination | 2013-08-29 |
Kings Lynn B Connection Project | Kings Lynn, Norfolk | National Grid | 27/07/2012 | 21/08/2012 | KLB_Connection | Decision | 2012-07-27 |
Thames Tideway Tunnel | Cross London Project | Thames Water | 28/02/2013 | 27/03/2013 | ThamesTunnel | Examination | 2013-02-28 |
North Doncaster Rail Chord (near Shaftholme) | North Doncaster | Network Rail | 22/06/2011 | 19/07/2011 | DonRailChord | DCO granted on 16/10/2012 | 2011-06-22 |
Walney Extension Offshore Wind Farm | Irish Sea off Walney Island | DONG Energy Walney Extension (UK) Ltd | 28/06/2013 | 22/07/2013 | WalneyWindFarm | Pre-examination | 2013-06-28 |
Rampion Offshore Wind Farm | Approximately 13 - 23km off the Sussex coast | E.ON Climate and Renewables | 01/03/2013 | 25/03/2013 | RampionWindFarm | Examination | 2013-03-01 |
Hornsea Offshore Wind Farm (Zone 4) - Project One | East Coast offshore Hornsea | SMart Wind Ltd | 30/07/2013 | 22/08/2013 | HornseaWindFarm | Pre-examination | 2013-07-30 |
Preesall Saltfield Underground Gas Storage | Preesall Saltfield, Over Wyre, Lancashire. | Halite Energy Group Ltd | 01/12/2011 | 23/12/2011 | PSGasStorage | DCO refused on 09/04/2013 | 2011-12-01 |
Hinkley Point C New Nuclear Power Station | Hinkley Point Somerset | NNB Generation Company Limited | 31/10/2011 | 24/11/2011 | HinkleyPoint | DCO granted on 19/03/2013 | 2011-10-31 |
Brechfa Forest West Wind Farm | Carmarthenshire, Wales | RWE Npower Renewables | 04/11/2011 | 30/11/2011 | BrechfaWindFarm | DCO granted on 12/03/2013 | 2011-11-04 |
Brig y Cwm Energy from Waste Generating Station | Cwmbargoed, Merthyr Tydfil | Covanta Brig y Cwm Ltd | 31/12/2010 | 26/01/2011 | n/a | withdrawn | 2010-12-31 |
Willington C Gas Pipeline | Near Burton on Trent | RWE npower | 30/07/2013 | 22/08/2013 | WillingtonPipe | Pre-examination | 2013-07-30 |
A556 Knutsford to Bowdon Scheme | Knutsford to Bowdon, Cheshire | Highways Agency | 24/04/2013 | 17/05/2013 | A556roadscheme | Examination | 2013-04-24 |
Electric line connection to Maesgwyn wind farm | Near Banwen, Neath | Western Power Distribution | 03/08/2010 | 31/08/2010 | n/a | withdrawn | 2010-08-03 |
East Anglia ONE Offshore Windfarm | 43 km off Norfolk/Suffolk coast | East Anglia One Ltd | 21/11/2012 | 14/12/2012 | EastAngliaOne | Examination | 2012-11-21 |
Atlantic Array Wind Farm | Bristol Channel | Channel Energy Limited | 14/06/2013 | 12/07/2013 | Atlantic_Array | Pre-examination | 2013-06-14 |
Rookery South Energy from Waste Generating Station | Rookery South Pit, Near Stewartby, Bedfordshire | Covanta Rookery South Limited | 05/08/2010 | 26/08/2010 | n/a | DCO granted on 13/10/2011 | 2010-08-05 |
Ipswich Rail Chord | 1km north of Ipswich goods yard | Network Rail | 29/06/2011 | 21/07/2011 | IpsRailChord | DCO granted on 05/09/2012 | 2011-06-29 |
Knottingley Power Project | Former Oxiris Chemical Works, Knottingley | Knottingley Power Limited | 04/10/2013 | Due by 01/11/2013 | n/a | Acceptance | 2013-10-04 |
Clocaenog Forest Wind Farm | Denbighshire CC and Conwy CBC, North Wales | RWE npower renewables | 28/03/2013 | 23/04/2013 | Clocaenog | Examination | 2013-03-28 |
Galloper Offshore Wind Farm | Approximately 27km off the coast of Suffolk | Galloper Wind Farm Ltd | 21/11/2011 | 19/12/2011 | GalloperWind | DCO granted on 24/05/2013 | 2011-11-21 |
Morpeth Northern Bypass | North of Morpeth, Northumberland | Northumberland County Council | 15/07/2013 | 07/08/2013 | MorpethBypass | Pre-examination | 2013-07-15 |
Triton Knoll Offshore Wind Farm | Greater Wash | Triton Knoll Offshore Wind Farm Limited | 31/01/2012 | 23/02/2012 | Triton_Knoll | DCO granted on 11/07/2013 | 2012-01-31 |
Kentish Flats Extension | Kentish Flats, Kent | Vattenfall | 14/10/2011 | 10/11/2011 | KentishFlatsExt | DCO granted on 19/02/2013 | 2011-10-14 |
Stafford Area Improvements - Norton Bridge Railway | 5Km NW of Stafford - centred on Norton Bridge | Network Rail | 19/12/2012 | 10/01/2013 | StaffordRail | Decision | 2012-12-19 |
North Killingholme Power Project | Land West of Humber Sea Terminal | C.GEN Killingholme Ltd | 25/03/2013 | 19/04/2013 | NKillingholme | Examination | 2013-03-25 |
Heysham to M6 Link Road | North of Lancaster M6 J34 to junction of A683 & A589 | Lancashire County Council | 06/12/2011 | 23/12/2011 | HeyshamtoM6Link | DCO granted on 19/03/2013 | 2011-12-06 |
North London (Electricity Line) Reinforcement | National Grid | 30/08/2012 | 27/09/2012 | NLondonLine | Examination | 2012-08-30 | |
M1 Junction 10a Grade Separation - Luton | Junction 10a M1 Luton | Luton Borough Council | 29/06/2012 | 27/07/2012 | LutonM1_10a | Decision | 2012-06-29 |
Redditch Branch Enhancement Scheme | Between Redditch and Alvechurch | Network Rail | 04/09/2012 | 01/10/2012 | RedditchBES | Decision | 2012-09-04 |
Roosecote (Barrow) Biomass Power Station | Within site of existing Roosecote Power Station | Centrica Energy | 03/07/2012 | 31/07/2012 | Roosecote | withdrawn | 2012-07-03 |
East Northants Resource Management Facility | 2.6km north of Kings Cliffe East Northamptonshire | Augean PLC | 14/03/2012 | 11/04/2012 | ENorthantsRMF | DCO granted on 11/07/2013 | 2012-03-14 |
Fieldes Lock - Rail linked power station | Ratty's Lane, Hoddesdon, Hertfordshire | Veolia Environmental Services (UK) Plc | 14/08/2012 | 07/09/2012 | FieldesLock | withdrawn | 2012-08-14 |
South Hook Combined Heat & Power Station | South Hook LNG Terminal Site, Pembrokeshire | QPI Global Ventures Ltd | 31/05/2013 | 26/06/2013 | SouthHookPower | Pre-examination | 2013-05-31 |
Woodside Link Houghton Regis Bedfordshire | North of Houghton Regis Dunstable Bedfordshire | Central Bedfordshire Council | 14/05/2013 | 11/06/2013 | WoodsideConnect | Examination | 2013-05-14 |
A30 Temple to Higher Carblake Improvement | Approximately 3 miles north east of Bodmin | Cornwall Council | 15/08/2013 | 09/09/2013 | A30improvement | Pre-examination | 2013-08-15 |
Application documents
The application documents are publicly available and easily accessible. Application documents for the above projects can be viewed on the relevant project page and hard copies of the application documents are also available to view free of charge at various locations in the vicinity of the proposed development site. To find out where you can view the application documents, contact the Planning Inspectorate case team (contact details can be found on the relevant project page).
The Planning Inspectorate does not itself have the facilities to produce large quantities of printed material. The most appropriate means, and we expect the quickest means of obtaining copies of application documents will be to contact the developer who will be able to process these requests at a cost. If you ask the Planning Inspectorate for paper copies of application documents this will be subject to the charging policy.