A gust of wind above three miles per hour is guaranteed to throttle the electricity in our infrastructurally challenged neighbourhood, so it was no surprise that we were thrust into darkness once the most widely publicised snow storm in meteorological history had set in on Friday evening. Our power company, Pepco, was brilliantly prepared, at least in linguistic terms. Callers to the firm were greeted with a message informing them that following the “winter storm event”, it was impossible to predict when power would be restored, but that this was likely to be a “multi-day event”. Sort of like those big weddings that well-to-do families in the south like to stage when they’ve placed their daughters with a chinless but appropriately loaded heir from the food processing industry. Here’s how Pepco’s “multi-day event” played out:
Evening: Welcome to the winter storm event! No power
SATURDAY
Morning: No power. All guests to gather by the log fire for body temperature enhancement event
Afternoon: No power. Cold buffet event by the fire
Evening: No power. Guests to form huddles to prevent hypothermia event (will continue until morning!)
SUNDAY
Morning: No power. Element-defying English breakfast event. Guests/neighbours no longer exchanging cheery quips about the weather conditions
Afternoon: No power (apart from two-minute burst of electricity at 3pm to raise your hopes of imminent warmth). Extended snow shovelling event
Evening: Power returns! Event over. Enjoy the last half hour of Super Bowl
Pepco’s message also advised its customers to “take appropriate action” in the face of the power outages, though it didn’t offer specific suggestions. I hope that at least one customer responded to this by seeking out the home of the PR stooge who thought up the phrase “multi-day event”, torching it, and then warming their hands on the embers. Otherwise known as an arson event. It wasn't me.