Grand Teton NP認証済みアカウント

@GrandTetonNPS

The Official Twitter account of Grand Teton National Park.

Moose, Wyoming
2009年6月に登録

ツイート

@GrandTetonNPSさんをブロックしました

このツイートを表示してもよろしいですか?これによって@GrandTetonNPSさんのブロックが解除されることはありません。

  1. 8月8日

    On August 12-August 16, visitors will see phased closures along the park's pathways. Pathways will be closed in 5 phases, beginning at the Gros Ventre Roundabout and proceeding north. Each phase will last 1 day. All work is weather dependent. Read more:

    取り消す
  2. 8月6日

    Heads up! On Weds, August 7 and Thurs, August 8, road work crews will begin striping around the Gros Ventre Roundabout. Work will take place between 10:00 p.m. and 2:00 a.m. Travelers should anticipate up to 30-minute delays.

    取り消す
  3. 8月6日

    Heads up! The unpaved section of the Moose-Wilson Road in Grand Teton National Park will be temporarily closed for seasonal dust abatement beginning 4 a.m. Tuesday, August 13 and will reopen by 8 a.m. Thursday, August 15. Read more:

    取り消す
  4. 8月5日

    Our pavement preservation work continues today in the northern area of the park, near South Gate of Yellowstone and near Moran Junction. Expect 15-minute delays in both areas, 7am-8pm. Please slow down and maintain posted speed limit as you travel through construction areas.

    取り消す
  5. 8月5日

    U.S. Hwy 89 is currently open in the the southern area of the park. Please be aware that if conditions change related to a wildland fire south of the park boundary, the road may be closed again as needed.

    取り消す
  6. 8月4日

    U.S. Hwy 89 is closed at the Gros Ventre Junction, in the southern area of the park, due to a wildland fire south of the park boundary. The highway is closed in both directions. It is unknown when the highway will reopen.

    取り消す
  7. 8月2日

    On 8/5/19, road work crews will begin fog sealing the highway at 2 locations concurrently: 1) Near the South Gate of Yellowstone traveling south 2) East Park Boundary east of Moran traveling south. Read more:

    取り消す
  8. 8月1日

    Pavement preservation continues in the park this weekend. Expect to see work on Friday 8/2 b/w Pacific Creek Road and Moran Junction. On Saturday, 8/3, work will take place b/w Triangle X Ranch and Elk Ranch Flats. Travelers should expect 30 min delays.

    取り消す
  9. 7月30日

    A cattle drive will take place early Sat. morning, 8/3, in Grand Teton. While underway, a 2-mile stretch of US HWY 26/89/191 will be temp closed to vehicle traffic from Moran JCT to the Elk Ranch Flats area. Expect a travel delay between approx 7AM-8AM.

    取り消す
  10. 7月30日

    Road work is happening on Hwy 89 north of Moose Junction, between Blacktail Ponds and Teton Point Overlook- expect 30-minute delays throughout the day and into the night.

    取り消す
  11. 7月25日

    Weekend road work has been scheduled for this coming Saturday, July 27, on U.S. Highway 89. Work will take place at Moran Junction, headed south. Travelers should expect up to 30-minute delays.

    取り消す
  12. 7月25日

    String Lake is a popular destination at Grand Teton. Researchers found ~4,000 people visit String Lake area each day during peak summer. GRTE has initiated changes to encourage opportunities for safe & enjoyable recreation while protecting park resources.

    取り消す
  13. 7月24日
    このスレッドを表示
    取り消す
  14. 7月24日

    Come on out and celebrate Menors Ferry Day, this Saturday, July 27 from 10:30 a.m. until 2:30 p.m. at the historic Menors Ferry, in Moose, WY. Historical activities include spinning demonstrations, music, historic interpretation, and a walking tour:

    このスレッドを表示
    取り消す
  15. 7月23日

    Fire danger has increased to “High” for Bridger-Teton National Forest, Grand Teton National Park, National Elk Refuge, and the rest of the Teton Interagency Dispatch Area. Read more:

    取り消す
  16. 7月22日

    Pavement preservation continues in the park & is currently focused on the North Park Road. Visitors can expect to see chip seal operations taking place between the Arizona Island picnic area to the top of Huckleberry Hill, just north of Colter Bay with delays of up to 30 minutes.

    取り消す
  17. 7月19日

    Grand Teton National Park Rangers responded to two emergency events in one day: 1) a climber seriously injured her leg in lower Garnett Canyon, 2) a hiker was injured by a large falling rock near the mouth of Death Canyon. Read more:

    取り消す
  18. 7月19日

    Work is almost complete on Hwy 89 between south boundary and Moose Junction. Crews will be painting lines today which will slow traffic. Expect some delays. Next week most work will take place north of Moran. Thanks for your patience.

    取り消す
  19. 7月17日

    Pavement preservation project will continue tomorrow morning near Moose Junction on Hwy 89. By late morning work will move to north of Colter Bay with up to 30-minute delays there. Work is weather dependent. Thanks for your patience.

    取り消す
  20. 7月17日

    Hwy 89 is open between Jackson Hole Airport and Moose Junction.

    取り消す

読み込みに時間がかかっているようです。

Twitterの処理能力の限界を超えているか、一時的な不具合が発生しています。やりなおすか、Twitterステータスで詳細をご確認ください。

    こちらもおすすめです

    ·