ಹುಡುಕಾಟದ ಫಲಿತಾಂಶಗಳು
  1. ಏಪ್ರಿ 9

    Glad to inform that the work of Palwal Elevated Highway on NH -19 in Haryana has been completed. The 3.25 km long, 4-lane elevated structure has been constructed at a total cost of ₹ 215.24 Cr.

    ಈ ಥ್ರೆಡ್ ತೋರಿಸಿ
  2. ಏಪ್ರಿ 9

    No....It's not EUROPE ❌ It's 🇮🇳 ♥️ 📸Credit: Insta: traveluvgrapher / amithsreedhar / droneholic_

  3. ಏಪ್ರಿ 5

    Construction of the very important Dimapur Bypass in Nagaland is ongoing and scheduled to be completed soon. This 35 km bypass is a Greenfield Alignment which will connect NH-36 and NH-39 avoiding the heavily congested Dimapur town.

    ಈ ಥ್ರೆಡ್ ತೋರಿಸಿ
  4. ಏಪ್ರಿ 11

    Delhi based S & P Infrastructure Developers Pvt. Ltd. bags three contracts from NHAI.

  5. ಏಪ್ರಿ 4

    Inauguration ceremony of 5 NH projects worth Rs 2871.80 Cr in Sonipat, Haryana.

  6. ಏಪ್ರಿ 5

    505.24 Ft. Major Bridge was constructed by NHIDCL on Barak River in Manipur which connects Imphal-Jiribam Section on NH-37 to Silchar in Assam. The bridge facilitates seamless movement of heavy traffic.

  7. ಏಪ್ರಿ 1

    63.1 Km Hayuliang-Hawai road with Total Project Cost of Rs. 621.06 Cr. in Arunachal Pradesh will provide connectivity in the strategically important remote areas of the State

  8. ಏಪ್ರಿ 5

    Delighted that is performing exceptionally well in constructing national assets at a fast speed.

    ಈ ಥ್ರೆಡ್ ತೋರಿಸಿ
  9. ಏಪ್ರಿ 11

    The 60 km long Varanasi Ring Road is being developed under Bharatmala Pariyojana to decongest the city. Click here to read more:

  10. ಏಪ್ರಿ 8

    NHAI opens one side of 1.4 km long ROB being constructed at Hulas Nagra on Lucknow-Bareilly National Highway for a trial run. The other side of the bridge is under construction where the launching of girders has been completed.

    ಈ ಥ್ರೆಡ್ ತೋರಿಸಿ
  11. ಏಪ್ರಿ 6

    New National Highway connecting - to be built at an estimate cost of ₹40 thousand crore and will help reduce the distance by 75 km. This 699km long Highway will connect major cities of to Bengaluru.

    ಈ ಥ್ರೆಡ್ ತೋರಿಸಿ

ಲೋಡಿಂಗ್ ಸಮಯ ಸ್ವಲ್ಪ ತೆಗೆದುಕೊಳ್ಳುತ್ತಿರುವಂತೆನಿಸುತ್ತದೆ.

Twitter ಸಾಮರ್ಥ್ಯ ಮೀರಿರಬಹುದು ಅಥವಾ ಕ್ಷಣಿಕವಾದ ತೊಂದರೆಯನ್ನು ಅನುಭವಿಸುತ್ತಿರಬಹುದು. ಮತ್ತೆ ಪ್ರಯತ್ನಿಸಿ ಅಥವಾ ಹೆಚ್ಚಿನ ಮಾಹಿತಿಗೆ Twitter ಸ್ಥಿತಿಗೆ ಭೇಟಿ ನೀಡಿ.