[HISTORY: Adopted by the Board of Supervisors
of the Township of White 6-24-2015 by Ord. No. 1067.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Attachment 1 - Attachment 1, Technical Specifications for Construction of Interceptors, Collectors, and Service Line Connections
Attachment 1 - Attachment 2, Technical Specification for Construction of Service Line Extensions
Attachment 3 - Attachment 3, Foot Front Assessment Rules
Assessment permits — See Ch. 92.
Construction — See Ch. 120.
Floodplain management — See Ch. 149.
Stormwater management — See Ch. 263.
Streets and sidewalks — See Ch. 270.
Subdivision and land development — See Ch. 275.
Water — See Ch. 311.
[1]
Editor’s Note: This ordinance also repealed former Ch. 235, which consisted of Part 1, Holding Tanks, adopted by Ord. No. 10-24-1973, as amended; Part 2, On-Lot Sewage Treatment Facilities, adopted 12-12-1979 by Ord. No. 863, as amended; Part 3, Wastewater Discharge to Sanitary Sewer, adopted 2-13-1985 by Ord. No. 890, as amended; Part 4, Sewer Use, adopted 5-9-1990 by Ord. No. 911, as amended; Part 5, Assessment of Civil Penalties and Costs, adopted 10-24-2001 by Ord. No. 972; and Part 6, McKee Run Sanitary Sewer System, adopted 6-26-2002 by Ord. No. 978, as amended.
Part 1 Holding Tanks
Article I Procedures for Use and Maintenance (§ 235-1 – § 235-7)
Part 2 On-Lot Sewage Treatment Facilities
Article II Operation and Maintenance (§ 235-8 – § 235-10)
Part 3 Wastewater Discharge to Sanitary Sewer
Article III Discharge Regulations (§ 235-11 – § 235-33)
Part 4 Sewer Use
Article IV Authorizations (§ 235-34 – § 235-44)
Article V Conditions of Service (§ 235-45 – § 235-51)
Article VI Application for Service (§ 235-52 – § 235-56)
Article VII Service Connections (§ 235-57 – § 235-62)
Article VIII Bills and Payments (§ 235-63 – § 235-72)
Article IX Sewer Line Construction Standards (§ 235-73 – § 235-76)
Article X Terminology (§ 235-77 – § 235-77)
Article XI Industrial Pretreatment (§ 235-78 – § 235-78)
Part 5 Assessment of Civil Penalties and Costs
Article XII Procedures (§ 235-94 – § 235-101)
Part 6 McKee Run Sanitary Sewer System